Instruments Workshop
   
 
 

Double Manual Harpsichord after H. Hemsch (March-April, 2002).
Stand Construction

 


 

The blanks for the legs are glued up, marked out with a template, and sawn on the bandsaw. Then the feet are carved.

 
 
 


 

Detail of the carving.

 
 
 


 

The main frame of the stand.

 
 
 


 

The apron is prepared next. The curved section is cut from solid stock, and then planed.

 

 
 

Stand Construction- Part 2

Back to Current Projects

 
 

Home | Instruments | Workshop | Contact
Italian Harpsichords | Flemish Harpsichords | French Harpsichords | German Harpsichords